Results-oriented Civil Engineer, highly skilled at design, drafting, cost estimation and presentations. Excellent public speaking and teamwork skills. High interest in municipal infrastructure.
In my role as Resident Engineer, I spearheaded the construction of a drinking water distribution system for the Bibile Water Supply Scheme, managed by the Bibile Pradesiya Sabha. Simultaneously, I directed the rehabilitation and augmentation of the existing water treatment plant for the Girandurukotte Water Supply Scheme, operated by the National Water Supply & Drainage Board.
Key Achievements:
Bibile Water Supply Scheme:
- Oversaw the installation of 16 kilometers of HDPE, PE100 pipelines to enhance service coverage and reinforce the existing distribution network.
- Acquired hands-on experience in earthworks, pipe works (laying, pressure testing, cleaning & disinfection), and facilitated service connections.
- Successfully managed road reinstatement works, ensuring seamless integration with the surrounding infrastructure.
Girandurukotte Water Supply Rehabilitation Project:
- Orchestrated the complete renewal of existing rapid sand filters, incorporating an advanced backwashing system for optimal performance.
In my capacity as the point of contact for the Managing Director, I took charge of the following critical responsibilities across both projects:
- Overall Site Management:
- Efficiently managed all aspects of site operations, including construction, material procurement, labor coordination, and site safety protocols
- Stakeholder Coordination:
- Facilitated seamless communication and collaboration with client representatives and other key stakeholders.
- Project Completion and Handover:
- Conducted testing, commissioning, and ensured the successful handover of completed pipelines for operational use.
- Quality Control and Assurance:
- Implemented rigorous quality control measures, ensuring adherence to project specifications and industry standards.
- Joint Measurements and Contract Management:
- Conducted meticulous joint measurements and effectively managed project contracts, ensuring accuracy and compliance.
- Efficiency and Safety Improvements:
- Spearheaded the implementation of advanced engineering techniques and cost-effective construction methods, significantly improving project efficiency.
- Enforced a culture of strict adherence to safety protocols through regular inspections, thereby enhancing overall site safety.
In summary, my role as a Resident Engineer for these water supply projects showcases my hands-on experience, leadership in site management, commitment to quality control, and a proven track record of enhancing project efficiency and safety standards.
As the Civil Engineer overseeing the sewerage treatment and pumping station project at Boralle, Colombo, I have been entrusted with critical responsibilities aimed at ensuring the successful execution of the infrastructure upgrade. Reporting directly to the Construction Manager, I am accountable for the following key areas:
1. Structural Planning and Maintenance:
- Precision in setting out structures and maintaining accurate line and levels for thorough inspection and approval by the Engineer's representative.
2. Quality Assurance in Construction:
- Rigorous scrutiny and approval of bar-bending schedules submitted by sub-contractors.
- Thorough checking of reinforcement and formworks, ensuring their readiness for concreting, subject to inspection by the Engineer's representative.
3. Material Management:
- Efficiently placed orders for ready-mix concrete to meet project requirements, ensuring timely and quality deliveries.
4. Financial Management:
- Conducted joint measurements for interim payments, accurately assessing sub-contractor's work completed and facilitating the financial aspects of the project.
5. Safety Oversight:
- Attended to safety issues with a focus on implementing and monitoring safety measures to ensure a secure working environment.
6. Resource Management:
- Effectively managed the allocation of labor, plants, and equipment, optimizing resources for maximum efficiency.
7. Project Efficiency Improvement:
- Implemented strategies to streamline the design process, resulting in improved project efficiency.
- Contributed to infrastructure durability by conducting thorough structural analysis and making informed material selections.
In summary, my role as a Civil Engineer for the sewerage treatment and pumping station project reflects a comprehensive skill set in structural planning, quality assurance, material management, financial oversight, safety management, and resource optimization. These efforts have not only ensured the successful implementation of the project but have also contributed to enhanced project efficiency and infrastructure durability.