Skilled Surveyor knowledgeable about equipment operation, computer-aided mapping and use of historical data. Over 5 years experience in land surveying for commercial, industrial and government projects. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
The Wellawaya i – Road Project (MO-06).
Responsibilities
· Control Points Traverse by using Total Station & Level Instrument & Preparing Control Points reports.
· Marking & checking Design Levels.
· Taking joint measurements with consultants.
· Topography surveying.
· Setting out Structures and Design Center Line.
· Taking Cross Sections and Longitudinal Sections.
· As built Surveying.
Equipment Used
· Sokkia CX - 105 Total Station
· Sokkia Level instrument
The Laggala New Town Water Supply Project.
Responsibilities
· Traverse by using Total Station & Level Instrument.
· Picking up the Coordinates of Pipe joints, valves, and other special locations of the pipeline with elevations.
· Topography surveying.
· Setting out Structures.
· Taking Cross Section and Longitudinal Section.
Equipment Used
· Sokkia CX - 105 Total Station
· Sokkia Level instrument
The System Rehabilitation for NRW Reduction in West part of the Colombo City Project.
Responsibilities
· Topography surveying the roads in Colombo area (more than 150km) & House to house survey of the Tenement Gardens (TG) by using RTK & Total Station for the designing purpose.
· Control point traverse by using RTK, Total Station & Level Instrument.
· Preparing control point report.
· Picking up Coordinates of pipeline.
· Taking Cross Section and Longitudinal Section.
Equipment Used
· CHC i80 GNSS RTK Machine
· Topcon ES-52 Total Station
· Sokkia Level instrument
The Outer Circular Highway – Northern Section II Project
Responsibilities
· Traverse by using Total Station & Level Instrument.
· Topography surveying.
· Marking Design Centerline.
· Setting out GCP & PHC piles.
· Taking Cross Section and Longitudinal Section.
· Inspect & supervised embankment work.
Equipment Used
· Sokkia CX-102 Total Station
· Sokkia Level instrument
The Southern Expressway Extension Project.
Responsibilities
· Traverse by using Total Station & Level Instrument.
· Topography surveying.
· Placing Monuments.
· Marking Design Centerline.
· Setting out structures.
· Taking Cross Sections and Longitudinal Sections.
· Marking & checking Design Levels.
Equipment Used
· Sokkia CX-102 Total Station
· Sokkia Level instrument
Ampara Water Project.
I have associated with Licensed Surveyor R A D Bandula for Initial Surveys of this project.
Responsibilities
· Traverse by using Total Station & Level Instrument.
· Preparing Control Points Reports.
· Topography surveying.
· Marking Design Centerline.
· Taking Cross Sections and Longitudinal Sections.
Equipment Used
· Sokkia 550 Total Station
· Nikon Total Station
· Trimble Total Station
· Sokkia Level instrument
The Meepe-Ingiriya road development project.
Responsibilities
· Marked the levels for laying ABC & Asphalt.
· Setting out Center line and Curve winding.
· Setting out and marked design levels for Culverts.
· Setting out the Retaining wall locations and Elevations.
· Inspect and supervise the all-excavation work.
· Marked the levels for Subbase and Sub grade.
· Take joint measurements with consultants.
Equipment Used
· Sokkia CX-102 Total Station
· Sokkia Level instrument
The New Plant Building project of Ansell Lanka (pvt) Ltd .
Responsibilities
· Setting out column and footing locations.
· Marked 1000FFL on ground floor.
· Inspect and Supervised R/F, Form work and concrete.
· Inspect and Supervised Brick work and plastering work.
· Direct labor handling.
· Preparation of Bar Schedules.
· Inspect and Supervised Wall painting and texture base painting.
· Quality Assurance of construction materials.
· Inspect and supervised the water proofing work.
· Handling interior Decoration work.
· Inspect and Supervised the Roofing work.
Equipment Used:
· Sokkia Level Machine
· Sokkia Theodolite